Future Concepts Team

The FCT was formed to address longer term (12-24 months) CDM/ATFM capabilities’ integration with applying an operational approach of using an integration of data, procedures and concepts. The team is charged with the exploration of combinations of concepts and capabilities identified through the CSG and the development of enhanced CDM tools.